Installation of protective wall panels
Measure the dimensions (length, width, height) on site and draw basic drawings by hand.
Based on the actual measured dimensions, use design software to create floor plans and construction drawings, calculate the required square meters of wall panels, the number of decorative lines, and related supporting facilities.
🛠️ Installation of wall panels made of different materials
There may be slight differences in the installation of wall panels made of different materials, but they generally follow these four orders: first board and then line, from outside to inside, from bottom to top, and from top to wall.
It refers to installing the main boards first, and then installing the lines. First, install extensively, and then handle details such as corners and edges.
It refers to the installation sequence starting from the wall of the room entrance and moving inward. Because installation at the back requires cutting, installing from the outside in is more aesthetically pleasing.
Install wall panels from bottom to top first.
It refers to installing the ceiling first and then installing the wall. When installing the ceiling, the keel should be fixed first, and the first wall protection panel should be fixed to the wall with steel nails before installation.
Product Display
Exhibition Show
Certificate & Honors
Frequently Asked Questions
❓ What are the initial steps before installing protective wall panels?
The installation begins with measuring the on-site dimensions (length, width, and height) and drawing basic hand blueprints. Following this, design software is used to create floor plans, construction drawings, and calculate the required square meters of wall panels, decorative lines, and supporting facilities.
❓ What general sequence should be followed when installing wall panels?
Generally, the installation follows four main orders: first board and then line, from outside to inside, from bottom to top, and from top to wall.
❓ What does the "board first, line later" rule mean?
This rule refers to installing the main wall boards first across the extensive wall areas, and then installing the decorative lines to handle details such as corners and edges.
❓ Why should wall panels be installed from the outside to the inside?
Installing from the room entrance wall and moving inward is more aesthetically pleasing because the final panels installed at the back of the room typically require cutting to fit the space.
❓ How is the order of top and wall panels handled?
The ceiling must be installed before the wall. During the ceiling installation, the keel should be fixed first, and the first wall protection panel must be secured to the wall with steel nails before proceeding.