Installation of protective wall panels
Measure
Measure the dimensions (length, width, height) on site and draw basic drawings by hand.
Draw blueprints
Based on the actual measured dimensions, use design software to create floor plans and construction drawings, calculate the required square meters of wall panels, the number of decorative lines, and related supporting facilities.
Installation of wall panels made of different materials
There may be slight differences in the installation of wall panels made of different materials, but they generally follow these four orders: first board and then line, from outside to inside, from bottom to top, and from top to wall.
It refers to installing the main boards first, and then installing the lines. First, install extensively, and then handle details such as corners and edges.
It refers to the installation sequence starting from the wall of the room entrance and moving inward. Because installation at the back requires cutting, installing from the outside in is more aesthetically pleasing.
Install wall panels from bottom to top first.
It refers to installing the ceiling first and then installing the wall. When installing the ceiling, the keel should be fixed first, and the first wall protection panel should be fixed to the wall with steel nails before installation.
Product Display
Exhibition show
Certificate & honors
Frequently Asked Questions
What is the first step in installing protective wall panels?
The initial phase is to measure the dimensions (length, width, and height) on-site and draw basic layout drawings by hand. This is followed by creating detailed blueprints using design software to calculate materials and accessories.
What sequence should be followed when installing wall panels?
The general installation sequence for protective wall panels follows four main orders: first board and then line, from outside to inside, from bottom to top, and top first, then wall.
Why should the main boards be installed before the decorative lines?
Installing the main boards first allows you to cover the extensive wall areas efficiently. Once the main boards are secured, you can handle detailed finishes such as corners, edges, and borders with the decorative lines.
What is the benefit of installing wall panels from the outside to the inside?
Starting from the room entrance and moving inward ensures a cleaner aesthetic. Since the panels installed last (at the back of the room) often require custom cutting, keeping them away from the entrance hides imperfections.
How should the ceiling and walls be coordinated during panel installation?
The ceiling must be installed before the wall. When doing the ceiling, you must fix the keel first. Then, secure the first protective wall panel to the wall with steel nails before proceeding with the rest of the installation.